Abbey Dawn FIT Project in Kingston, Ontario, Canada with UGEI – Endura

This Feed-in-Tariff (FIT) project allowed us to test the limits on working with difficult terrain such as wet and muddy sites. It was a unique experience that demonstrated the flexibility of above ground ballasts that make our Savanna product usable on an otherwise unfeasible site. Monitor this system in real time here.
Project size: 600 kW

Abbey Dawn